01
Tell us what you need
Model, quantity, destination port. If you are unsure of the model, describe the job and we will propose two options.
02
Quotation
FOB or CIF, valid 30 days for machines in production and 15 days for steel-intensive products.
03
Contract and deposit
30% T/T deposit is standard; L/C at sight is accepted above USD 100,000.
04
Production and progress photos
You receive photo and video reports at frame, paint and final assembly stages.
05
Inspection
SGS, BV, TÜV or your own inspector is welcome at any stage.
06
Loading
Lashing photos, hour meter, serial plate and seal number are sent the day the container is sealed.
07
Documents
Bill of lading, commercial invoice, packing list, certificate of origin, CE declaration and fumigation certificate.
08
After-sales
Remote commissioning, English manuals, parts list with codes and a 12-month warranty.